      <title>How does 24/7 emergency response work?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/how-24-7-emergency-response-works/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/how-24-7-emergency-response-works/</guid>
      <description>Customers with a maintenance contract can reach the emergency line around the clock; a fault ticket is opened and an expert is dispatched within the response time (SLA) defined in the contract. Berdata’s SLA levels are defined as 2, 4, 6, 12, 24 and 48 hours; the level is set in the contract.</description>
      <category>Maintenance and service</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Do you maintain precision cooling units of other brands?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/multi-brand-maintenance/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/multi-brand-maintenance/</guid>
      <description>Yes. In addition to HiRef, for which it is the distributor, Berdata provides preventive maintenance and repairs for precision cooling units of other brands such as Climaveneta, Liebert &amp; Hiross, STULZ, DENCO and RC. Existing equipment is inspected during a site survey and a condition report is prepared before the contract.</description>
      <category>Maintenance and service</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Does FM-200 damage equipment or data?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/does-fm-200-damage-equipment/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/does-fm-200-damage-equipment/</guid>
      <description>No. FM-200 is electrically non-conductive and leaves no residue; equipment does not get wet and needs no cleaning. That is why it is preferred in rooms with energized electronic equipment. Fast extinguishing also limits the damage the fire itself can cause.</description>
      <category>Gas fire suppression</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How is the FM-200 quantity calculated?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/fm-200-quantity-calculation/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/fm-200-quantity-calculation/</guid>
      <description>The quantity is calculated from the net protected volume, the lowest design ambient temperature and the design concentration defined in the standard (TS EN 15004 or NFPA 2001) for the fire class. Raised-floor voids and ceiling voids are treated as separate volumes, and the result is verified with a hydraulic calculation of pipes and nozzles.</description>
      <category>Gas fire suppression</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How does an FM-200 gas suppression system work? Components and design steps</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/how-fm-200-gas-suppression-works/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/how-fm-200-gas-suppression-works/</guid>
      <description>FM-200 (HFC-227ea) systems discharge a clean extinguishing agent into the protected volume within about 10 seconds of fire detection; the agent extinguishes mainly by absorbing heat from the flame and leaves no residue. A system consists of detection, a control panel, agent cylinders, piping and nozzles, and is designed around the integrity of the protected volume.</description>
      <category>Gas fire suppression</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Is FM-200 dangerous for people?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/is-fm-200-safe-for-people/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/is-fm-200-safe-for-people/</guid>
      <description>In a system designed to the standards, FM-200 is discharged at concentrations approved for occupied spaces; the design concentration is kept below the no-observed-adverse-effect level (NOAEL, 9%). Even so, the room must be evacuated during discharge; the fire itself and its combustion products are the real hazard.</description>
      <category>Gas fire suppression</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>What is FM-200 and how does it extinguish fire?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/what-is-fm-200/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/what-is-fm-200/</guid>
      <description>FM-200 is a clean extinguishing agent, chemically heptafluoropropane (HFC-227ea), that is colourless, odourless and electrically non-conductive. It extinguishes fire mainly by absorbing heat from the flame and leaves no residue, which is why it is used where electronic equipment is installed, such as server rooms, data centers and electrical rooms.</description>
      <category>Gas fire suppression</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Free cooling and adiabatic cooling: saving energy in the data center</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/free-cooling-and-adiabatic-cooling/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/free-cooling-and-adiabatic-cooling/</guid>
      <description>Free cooling uses cool outdoor conditions instead of compressors whenever the outside is cool enough; adiabatic cooling pre-cools air by evaporating water and extends the hours in which free cooling is possible. Together they can substantially reduce mechanical cooling and energy consumption.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How often should precision cooling be maintained?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/precision-cooling-maintenance-frequency/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/precision-cooling-maintenance-frequency/</guid>
      <description>Preventive maintenance for precision cooling is scheduled quarterly at most sites; filters may be checked more often depending on dust levels. Comprehensive work such as coil cleaning, calibration and testing the standby unit is done at least once a year. The exact interval depends on the manufacturer’s recommendation, the age of the equipment and room conditions.</description>
      <category>Maintenance and service</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>What is the difference between precision and comfort air conditioning?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/precision-vs-comfort-air-conditioning/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/precision-vs-comfort-air-conditioning/</guid>
      <description>Precision cooling units are designed for server rooms and data centers to run around the clock; they keep temperature and humidity within a narrow band and remove the dry heat of equipment with high airflow. Comfort air conditioners are designed for people, assume intermittent operation and do not control humidity; using them in a server room increases the risk of failures and humidity problems.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How is precision cooling capacity calculated?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/precision-cooling-capacity-calculation/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/precision-cooling-capacity-calculation/</guid>
      <description>Capacity is based on the total heat load of the room: the power drawn by IT equipment (almost all of which becomes heat), UPS losses, lighting and building loads are added up. A moderate growth margin is added, a separate unit is planned for redundancy (N+1), and selection is based on sensible (dry) capacity rather than total capacity.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>In-row, perimeter and in-rack cooling: which one when?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/in-row-perimeter-and-in-rack-cooling/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/in-row-perimeter-and-in-rack-cooling/</guid>
      <description>Perimeter units cool the whole room from its edges and are efficient in large, medium-density spaces. In-row units sit between racks and capture heat at the source, which suits high-density racks. In-rack coolers are a compact solution for a single rack or very small rooms.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>What is checked during preventive maintenance?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/preventive-maintenance-checklist/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/preventive-maintenance-checklist/</guid>
      <description>For precision cooling: filters, drain pan and line, humidifier, fans and motors, electrical connections, refrigerant pressures and compressor currents are checked; alarm history is reviewed and operating values are recorded. Monitoring sensors and alarm notifications are tested, and in gas suppression systems cylinder pressure and detection are checked.</description>
      <category>Maintenance and service</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>What is N+1 redundancy and does a server room need it?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/is-n-plus-1-redundancy-needed/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/is-n-plus-1-redundancy-needed/</guid>
      <description>N+1 means adding one standby unit to the number of units required to carry the load (N), so that cooling continues when a unit fails or is under maintenance. It is recommended for any server room that is critical to business continuity; a room with a single unit is at risk at that unit’s first failure.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How does an environmental monitoring device send alarms?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/environmental-monitoring-alarm-notifications/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/environmental-monitoring-alarm-notifications/</guid>
      <description>Monitoring devices can send alarms through several channels such as email, SMS, voice calls, mobile app notifications and SNMP traps; some models also support messaging services such as Telegram and local light/sound alarms. The recommended setup is at least two channels and an escalation chain that moves to the next person if there is no response.</description>
      <category>Environmental monitoring</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>What is a hot and cold aisle layout and how is it set up?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/hot-and-cold-aisle-layout/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/hot-and-cold-aisle-layout/</guid>
      <description>A hot and cold aisle layout arranges racks front-to-front (cold aisle) and back-to-back (hot aisle) so that cold supply air and hot exhaust air do not mix. When one of the aisles is contained, precision cooling units deliver a more stable temperature with less energy.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Where should temperature sensors be placed on a rack?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/where-to-place-temperature-sensors/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/where-to-place-temperature-sensors/</guid>
      <description>Temperature sensors belong at the front of the rack, where servers draw in air, ideally at bottom, middle and top. Racks furthest from the cooling unit, at row ends and with the highest density take priority. A sensor at the rear measures exhaust air, which is informative but no substitute for inlet temperature.</description>
      <category>Environmental monitoring</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Server room preventive maintenance plan: what, and how often?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/server-room-preventive-maintenance-plan/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/server-room-preventive-maintenance-plan/</guid>
      <description>Preventive maintenance is the planned inspection of precision cooling, environmental monitoring and gas suppression systems before they fail. Filters, drains, refrigerant pressures, fans, electrical connections and sensors are checked at set intervals and findings are recorded. A good plan clearly reduces sudden failures and the need for emergency response.</description>
      <category>Maintenance and service</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Server room environmental monitoring guide: which sensor goes where?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/server-room-environmental-monitoring-guide/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/server-room-environmental-monitoring-guide/</guid>
      <description>Effective environmental monitoring brings temperature readings from rack fronts, room humidity, water leaks, smoke, door status and power into one system, and routes alarms to the right people. Sensor placement matters more than sensor count: a sensor in the wrong spot reports problems too late.</description>
      <category>Environmental monitoring</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>What temperature should a server room be?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/server-room-temperature/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/server-room-temperature/</guid>
      <description>The widely used ASHRAE TC 9.9 guideline recommends 18–27 °C at the air inlet of IT equipment. What matters is not the room average but the temperature at the rack fronts where servers draw in air; the target is set together with the equipment manufacturers’ requirements.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Server room cooling guide: choosing precision cooling and sizing the capacity</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/server-room-cooling-guide/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/server-room-cooling-guide/</guid>
      <description>The cooling requirement of a server room starts with the electrical power drawn by its IT equipment, almost all of which turns into heat. The heat load is calculated first, redundancy and growth margins are added, and only then are the system type (DX or chilled water) and the air distribution method chosen.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Can a split air conditioner be used in a server room?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/split-air-conditioner-in-server-room/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/split-air-conditioner-in-server-room/</guid>
      <description>It may serve as a temporary measure in very small, non-critical rooms, but it is not recommended. Split units are not designed for 24/7 operation or humidity control, are inefficient under high dry-heat loads and usually lack alarms, remote monitoring and coordinated operation with a standby unit.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Which parameters should be monitored in a server room?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/what-to-monitor-in-a-server-room/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/what-to-monitor-in-a-server-room/</guid>
      <description>At a minimum: temperature (at rack fronts), humidity, water leaks, smoke, door status and power (mains, UPS, generator). Adding cooling unit alarms, airflow and rack currents means most failures are noticed before an outage occurs.</description>
      <category>Environmental monitoring</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>What should the humidity be in a server room?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/server-room-humidity/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/server-room-humidity/</guid>
      <description>The ASHRAE TC 9.9 guideline defines humidity mainly by dew point rather than relative humidity; the recommended range is roughly -9 °C to 15 °C dew point with a maximum of 60% RH. Very low humidity raises the risk of static electricity, very high humidity the risk of condensation and corrosion; precision cooling units are set to stay within this range.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>What is the difference between chilled water and DX cooling?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/chilled-water-vs-dx/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/chilled-water-vs-dx/</guid>
      <description>DX (direct expansion) units have their own compressor and outdoor unit, and refrigerant evaporates directly in the unit; they are common in small and medium rooms. Chilled-water units use chilled water from a central chiller; they stand out in large halls, at high capacities and in projects that aim to use free cooling.</description>
      <category>Cooling and air conditioning</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Where should water leak sensors be placed?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/where-to-place-water-leak-sensors/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/where-to-place-water-leak-sensors/</guid>
      <description>Leak sensors go where water collects first: under precision cooling units and along drain lines, along pipe routes under raised floors, at the base of external walls and windows, and below services crossing the ceiling. Cable-type sensors are used for long runs and spot sensors for single points.</description>
      <category>Environmental monitoring</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>
    </item>
    <item>
      <title>What is the difference between Vutlan and Room Alert?</title>
      <link>https://www.berdata.com.tr/en/knowledge-base/vutlan-vs-room-alert/</link>
      <guid>https://www.berdata.com.tr/en/knowledge-base/vutlan-vs-room-alert/</guid>
      <description>Vutlan stands out in data centers, telecom and industrial sites with up to 150 sensors per unit, code-free logic schemes, LoRaWAN wireless sensors, managed PDUs and Modbus support. Room Alert is a fast solution for server rooms, telecom closets and remote locations with plug-and-play setup, PoE and cloud-based management.</description>
      <category>Environmental monitoring</category>
      <pubDate>Wed, 25 Nov 2026 09:00:00 GMT</pubDate>